@fastify/http-proxy
NIST NVD Reports Critical Path-Restriction Bypass in @fastify/http-proxy (CVE-2026-120213)
The National Vulnerability Database published CVE-2026-120213, a critical flaw in the @fastify/http-proxy Fastify plugin affecting versions 9.0.0 through 11.6.5. When parameterized prefix and rewritePrefix options are used, decoded route parameters are inserted into rewritePrefix without re-encoding, letting encoded separators and delimiters inject upstream path segments. An unauthenticated remote attacker could reach upstream locations outside the intended prefix, potentially enabling server-side request forgery or authorization bypass.
Recommended action
Upgrade @fastify/http-proxy to version 11.6.6 or later, as no workaround other than upgrading exists.
- Identifiers
- CVE-2026-120213
- Severity
- critical
- Disclosure
- Not established by the sources
- Source publication
- 2 Nov 2026, 11:17 UTC
- Published on locker.ae
- 27 Nov 2026, 17:08 UTC
- Last updated
- 27 Nov 2026, 17:08 UTC
Sources
This is an AI-assisted editorial summary of the cited material. It does not establish that a particular system is vulnerable; affected versions and configuration requirements remain defined by the vendor advisory.
Update history
First publication